Project reference 00104

Pavers

Identify the complete machine sequence, tractor interfaces and reference technology. A machine mentioned in a scenario is not a confirmed compatible attachment or a verified available configuration.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Pavers

A paver receives a prepared supporting surface and specified paving material. Upstream grading should remove profile errors before they are transferred into the wearing layer.

Before moving material

Confirm the supporting-layer acceptance and finished-level allowance.

Receiving operation and checks

Complete the paving contractor's placement and compaction process. Check joints and connections with existing pavement.

Dugong is not a paving machine and should not be presented as one.

Read the complete Pavers guide

Excavator to Grading Workflow

An excavator can open ground, remove unsuitable material and work below surrounding level. The grading handover begins when accessible material and formation are ready for controlled redistribution.

Before moving material

Agree excavation limits and the formation reference.

Receiving operation and checks

Compact, survey or place the next layer as specified. Check trench edges, disturbed areas and remaining excavation defects.

A scraper is not a substitute for an excavator's digging or lifting functions.

Read the complete Excavator to Grading Workflow guide

Bulldozer to Grading Workflow

A bulldozer can move substantial material by pushing; a scraper can collect and carry selected material between defined points. The handover should occur when broad quantity movement gives way to controlled placement or trimming.

Before moving material

Complete bulk pushing and establish the remaining surface error.

Receiving operation and checks

Fine grade and independently check the surface. Inspect broad joins between dozer runs and receiving areas.

Where the dozer can finish efficiently, adding another machine may not improve the job.

Read the complete Bulldozer to Grading Workflow guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group